CONCORDE BATTERY CORPORATION
2009 San Bernardino Road West Covina, CA 91790 Tel. (626) 813-1234 Fax. (626) 813-1235
MAINTENANCE-FREE, VALVE-REGULATED,
SEALED LEAD ACID BATTERIES.
DESIGNED FOR DEEP CYCLE / BACK-UP POWER
PHOTOVOLTAIC APPLICATIONS.
BATTERY SERVICE INSTRUCTIONS
1. CHARGE PROCEDURES
Sun-Xtender Batteries are charged at the factory and are ready for installation when they are received.
While in storage they should be boost charged every 90 days or when the open circuit voltage drops below 2.08 V./cell (12.5 V. for a 12 volt battery).
The battery temperature should be 20 C. (68 F.) or higher.
Boost charge the battery using a regulated constant voltage charger.
Set the charge voltage to 2.37 to 2.40 V./cell (14.2 to 14.4 V. for a 12 volt battery).
Charge the battery until the charger reaches the 2.37 to 2.40 V./cell (14.2 to 14.4 for a 12 volt battery) and leave the battery on charge for an additional 4 to 6 hours before removing it from the charger.
Alternately, the battery can be charged to the voltage setting until the current from the charger drops to 0.5 A. per 100 Ampere Hour rating of the battery.
2. RESERVE CAPACITY TEST
The procedure described below allows the Ampere Hour Capacity of the battery to be tested. This test will insure that the battery is capable of providing the necessary capacity to perform properly.
Charge the battery in accordance with paragraph 1, Charging Procedures, above.
With the battery temperature above 20 C. (68 F.) discharge the battery at 25 Amps to 1.75 V./cell (10.5 V. for a 12 volt battery).
Record the amount of time in minutes of full discharge.
If the battery fails to deliver 80% of its rated discharge time, the battery should be replaced.
The discharge times for each of the Sun-Xtender batteries are listed in the table below.
25 A DISCHARGE MINUTES TIME
12 VOLT BATTERIES
6 VOLT BATTERIES
Part Number
80%
Rated
Part Number
80%
Rated
PVX-340T
40
50
PVX-1380T
194
242
PVX-420T
49
61
PVX-1680T
238
298
PVX-490T
67
84
PVX-1780T
253
316
PVX-560T
77
96
PVX-2080T
298
372
PVX-690T
97
121
PVX-2160T
312
390
PVX-840T
119
149
PVX-2240L
394
492
PVX-890T
126
158
2 VOLT BATTERIES
PVX-1040T
149
186
PVX-4140T
581
726
PVX-1080T
156
195
PVX-5040T
715
894
PVX-2120L
312
390
PVX-5340T
758
948
PVX-2580L
403
504
PVX-6240T
893
1116
PVX-6480T
936
1170
3. CONDITIONING CHARGE
Batteries that have not been boost charged and have been in storage for long periods (not over 9 months) or that have been operated in a partial or low state of charge for long periods (90 days or more) may need a conditioning charge.
Charge the battery at a constant current rate using the table below for the specific battery involved.
Charge the battery until its voltage remains constant or decreases slightly.
Remove the battery from charge. It is recommended that a reserve capacity discharge test be performed (instructions below) to insure that the battery capacity is at or above the recommended minimum 80% of its capacity.
After the test is completed, recharge the battery as described in Item 1.
During the conditioning charge process, the battery will get hot. If the battery container’s temperature exceeds 50 C. (122 F.) remove the battery from charge and contact Concorde.
CONSTANT CURRENT CHARGE RATE TABLE
12 VOLT BATTERIES
6 VOLT BATTERIES
Part #
Amps
Part #
Amps
PVX-340T
2
PVX-1380T
7
PVX-420T
2
PVX-1680T
8
PVX-490T
2
PVX-1780T
8
PVX-560T
3
PVX-2080T
10
PVX-690T
3
PVX-2160T
10
PVX-840T
4
PVX-2240L
11
PVX-890T
4
2 VOLT BATTERIES
PVX-1040T
5
PVX-4140T
19
PVX-1080T
5
PVX-5040T
24
PVX-2120L
10
PVX-5340T
24
PVX-2580L
12
PVX-6240T
30
PVX-6480T
30
The data/information contained herein has been reviewed and approved for
general release on the basis that this document contains no